Contents
- Introduction
- Background
- The infrastructure schedule
- Community Infrastructure Levy (CIL)
- Section 106 planning obligations
- The infrastructure list
- Infrastructure funding statement schedule 2024/25: Schedule 1
- s106 obligations report
- Appendix 1: Table 1, Town and Parish Council spend
- Appendix 1: Table 2, Community committee spend
- Appendix 2: s106 spend
1. Introduction
1.1. Following amendments to legislation relating to the Community Infrastructure Levy (CIL), (The Community Infrastructure Levy (Amendment) (England) Regulations 2019 No.1103), which came into force on 1 September 2019, Local Planning Authorities (acting as a Charging Authority under CIL) are now required to produce an annual Infrastructure Funding Statement (IFS). This is the second IFS to be issued by Leeds City Council as a Local Planning Authority (LPA). It sets out information for the financial year 1 April 2024 to 31 March 2025, relating to CIL and developer contributions received via Section 106 Agreements, as well as being intended to outline forthcoming infrastructure requirements and expenditure, aligning this with planned development and local planning policies.
1.2 Section 106 obligations are obtained under the provisions of Section 106 of the Town and Country Planning Act 1990 (commonly referred to as planning obligations or developer contributions) and are used to fund the provision of supporting infrastructure, which is required as a result of development.
1.3 The main areas required to be included in the IFS are a statement of the infrastructure projects or types of infrastructure which the Charging Authority (Leeds City Council) intends will be, or may be, wholly or partly funded by CIL (“the infrastructure list”); a report about CIL, in relation to the previous financial year (“the reporting year”); and a report about s106 planning obligations, in relation to the reporting year.
2. Background
2.1 The information included in this statement will be updated annually and published on the council’s website each year by 31 December.
2.2 The Leeds CIL Charging Schedule was adopted and then implemented on 6 April 2015. The council’s Executive Board make key decisions around spending of the future CIL income, directing it into 2 main funding streams, a ‘Strategic Fund’ and a ‘Neighbourhood Fund’, plus up to 5% for administrative costs.
2.3 The Neighbourhood Fund is 15% in an area without an adopted Neighbourhood Plan, and 25% in an area with an adopted Neighbourhood Plan. In parished areas it is to be passed directly to those local Town and Parish Councils, as required by national CIL regulations. In non-parished areas, the decisions about spending are delegated to the relevant Leeds City Council Community Committee and the CIL Neighbourhood Fund ‘ring fenced’ by the city council to spend in the local area.
2.4 Under section 106 (s106) of the Town and Country Planning Act 1990, a LPA can seek planning obligations to be delivered either/or physically on-site and contributions to off-site provision in lieu, when it is considered that a development will have impacts that cannot be mitigated through conditions in the planning permission.
2.5 This IFS combines information for both s106 and CIL. By combining consideration of both CIL and s106 contributions here, a more holistic overview of infrastructure funding and provision which is provided through the planning system is given. Planning Policy Guidance acknowledges that data on developer contributions is imperfect, and that it represents estimates at a given point in time and can be subject to change. However, the data published should be the most robust available at the time.
3. The infrastructure schedule
3.1 The infrastructure schedule below sets out the infrastructure funding statement schedule for 2024/25. The schedule provides information for both CIL and section 106 receipts, outlining what has been received for the year, expenditure and what was retained by the end of the financial year.
4. Community Infrastructure Levy (CIL)
4.1 CIL is a charge which can be levied by Local Planning Authorities on new development in their area. It is a planning charge for developers and landowners which is used to support the development of infrastructure. The CIL is charged per square metre on new developments and is based on viability evidence, which sets out rates which are deliverable along with Local Plan policies such as affordable housing, greenspace, and other section 106 requirements. The liability of CIL is triggered on commencement of development and there can often be a time lag between the grant of a planning permission and the collection of CIL.
4.2 The first part of the schedule sets out an overview of CIL monies received for the financial year 2024/25. In summary this includes:
- CIL receipts invoiced (as set out in row 1a): these are for demand notices issued in the reporting year. However, this is not received until the development commences on site
- CIL receipts received in the reporting year (as set out in row 1b)
- the total amount of CIL expenditure for the reporting year (row 1e)
- the total amount of CIL receipts, whenever collected, which were allocated but not spent during the reporting year (row 1f)
- the items of infrastructure on which CIL (including land payments) has been spent, and the amount of CIL spent on each item (row 1g(i))
4.3 In the reporting year (2024-25), the total value of CIL set out in issued demand notices is £11,452,396.49 and the council has received £10,557,385.94 from the reporting year and previous years. In terms of expenditure for the financial year, a total of £2,781,807.63 has been spent on the Kirklands Bungalows Autism Project and the Learning Places deficit. The council has also spent £530,916.18 (5%) to cover administrative costs, in line with regulatory provisions.
4.4 A total of £340,702.90 has been passed to Parish and Town Councils in the reporting year. The Parish and Town Councils have spent £497,015.03 on local infrastructure. Table 1 in Appendix 1 provides a summary of this expenditure.
4.5 The total Neighbourhood Fund receipts retained by the council’s Community Committees in the reporting year is £1,275,877.07. The Community Committees have spent £924,202.65 on local infrastructure. Table 2 in Appendix 1 provides a summary of that expenditure.
5. Section 106 planning obligations
5.1 Planning obligations are secured from an applicant/developer by way of legal agreements (Section 106 agreements) which can be attached to a planning permission, to mitigate the impact of an otherwise unacceptable development. Obligations can only be sought where they are directly related to the development, fairly and reasonably related in scale and kind to the development, and necessary to make the development acceptable in planning terms.
5.2 Obligations are often drafted so that certain infrastructure is specified which is to be provided or upon which the monetary in-lieu contribution is to be spent. Correspondingly, obligations can often be tied to a particular geographical location. Contributions can be paid over a number of years and triggers for payment are often dependent on particular phases of the development being commenced or completed. Therefore, contributions collected in a given year do not necessarily relate to planning permissions granted, developments commenced or sites/works completed in the same year.
5.3 The first part of the schedule sets out an overview of s106 monies received for the financial year 2024/25. In summary this includes:
- the total amount of money to be provided under any planning obligations which were entered into during the reporting year (row 3a)
- the total amount of money under any planning obligations which was received during the reporting year (row 3b)
- the total amount of money (received under any planning obligations) which was allocated but not spent during the reporting year for funding infrastructure (row 3e)
- the total amount of money (received under any planning obligations) which was spent by the authority (including transferring it to another person to spend) (row 3f)
5.4 In the reporting year (2024-25), Leeds City Council has granted planning permissions with s106 planning obligations totalling £4,081,212.43. The council has received £17,382,996.09 from in year and historical planning permissions. The council has spent £8,743,965.11 of s106 funds on infrastructure. A total balance of s106 funds received before the reporting year is £49,153,823.80. The majority of these funds have already been allocated for specific projects identified within the individual s106 agreements and/or formally committed to projects by the relevant Service Areas. The council has spent £147,600 on monitoring and reporting of S106 contributions. In terms of affordable housing provision, 115 on-site units are to be provided under planning obligations entered into in the reporting year. Appendix 2 provides further details of where section 106 funding has been spent and allocated.
6. The infrastructure list
6.1 There are various options and pressures in relation to spend of the CIL Strategic Fund, such as competing demands from varying different types of infrastructure to include schools, public transport and flood alleviation. There are also various pressures in terms of where the Strategic Fund is invested geographically, as it can be spent on strategic infrastructure throughout Leeds and is consequently not geographically restricted. Priorities for spend have been set as part of the council’s budget setting process and aligned with the Capital Programme.
6.2 The IDP identifies, as far as possible, currently planned infrastructure provision in the Leeds Metropolitan District, including the critical infrastructure necessary for the delivery of the adopted Site Allocations Plan (SAP) and Aire Valley Leeds Area Action Plan (AVLAAP), within the context of the Core Strategy up until 2028. The IDP considers physical infrastructure (such as transport and flood defences), social and community infrastructure (such as schools) and green infrastructure. The IDP therefore provides an overarching framework for other service providers’ plans and programmes, to bring them into one place and to ensure that all providers are planning for the predicted locations of future growth as set out in the SAP and AVLAAP, whilst also reflecting current infrastructure needs. The IDP has informed infrastructure priorities and these are set out below.
6.3 The need for strategic infrastructure is considered on an annual basis to support the delivery of infrastructure projects in line with the capital programme. The demand for infrastructure across Leeds is inevitably wide ranging. The Community Infrastructure Levy (CIL) provides one component that contributes to the delivery of infrastructure within Leeds. At a strategic level, a number of projects have been prioritised. The project priority areas for infrastructure provision for the financial year 2025/26 for the Strategic Fund, are match funding contributions for a new Complex Needs Home for children and for Strategic Highways and Transportation Schemes.
Infrastructure funding statement schedule 2024/25
Schedule 1
Community Infrastructure Levy (CIL) report
| Requirement | Amount | Comment | |
|---|---|---|---|
| 1. | The matters to be included in the CIL report are— | ||
| a | the total value of CIL set out in all demand notices issued in the reporting year; | £11,452,396.49 | |
| b | the total amount of CIL receipts for the reporting year; | £10,557,385.94 | |
| c | the total amount of CIL receipts, collected by the authority, or by another person on its behalf, before the reporting year but which have not been allocated; | £0 | |
| d | the total amount of CIL receipts, collected by the authority, or by another person on its behalf, before the reporting year and which have been allocated in the reporting year; | £0 | |
| e | the total amount of CIL expenditure for the reporting year; | £2,781,807.63 (strategic fund) |
|
| f | the total amount of CIL receipts, whenever collected, which were allocated but not spent during the reporting year; | £5,749,092.37 (strategic fund) | |
| g | in relation to CIL expenditure for the reporting year, summary details of— | ||
| g (i) | the items of infrastructure on which CIL (including land payments) has been spent, and the amount of CIL spent on each item; | £2,366,520.20 Kirklands Bungalows Autism Project. £415,287.43 Learning Places | |
| g (ii) | the amount of CIL spent on repaying money borrowed, including any interest, with details of the items of infrastructure which that money was used to provide (wholly or in part); | £0 | |
| g (iii) | the amount of CIL spent on administrative expenses pursuant to regulation 61, and that amount expressed as a percentage of CIL collected in that year in accordance with that regulation; | £530,916.18 (5%) | |
| h | in relation to CIL receipts, whenever collected, which were allocated but not spent during the reporting year, summary details of the items of infrastructure on which CIL (including land payments) has been allocated, and the amount of CIL allocated to each item; | ||
| i | the amount of CIL passed to— | ||
| i (i) | any parish council under regulation 59A or 59B; and | £340,702.90 | Amount passed to Parish and Town Councils. |
| i (ii) | any person under regulation 59(4) | ||
| j | summary details of the receipt and expenditure of CIL to which regulation 59E or 59F applied during the reporting year including— | ||
| j (i) | the total CIL receipts that regulations 59E and 59F applied to; | £1,275,877.07 | Amount retained by the Charging Authority (Community Committee) where there is no Parish or Town Council. |
| j (ii) | the items of infrastructure to which the CIL receipts to which regulations 59E and 59F applied have been allocated or spent, and the amount of expenditure allocated or spent on each item; | See Appendix 1, Table 2 | |
| k | summary details of any notices served in accordance with regulation 59E, including— | ||
| k (i) | the total value of CIL receipts requested from each parish council; | £0 | |
| k (ii) | any funds not yet recovered from each parish council at the end of the reporting year; | £0 | |
| I | the total amount of— | ||
| l (i) | CIL receipts for the reporting year retained at the end of the reporting year other than those to which regulation 59E or 59F applied; | £0 | |
| l (ii) | CIL receipts from previous years retained at the end of the reporting year other than those to which regulation 59E or 59F applied; | £0 | |
| l (iii) | CIL receipts for the reporting year to which regulation 59E or 59F applied retained at the end of the reporting year; | £0 | |
| l (iv) | CIL receipts from previous years to which regulation 59E or 59F applied retained at the end of the reporting year. | £0 | |
| 2 | For the purposes of paragraph 1— | ||
| a | CIL collected by an authority includes land payments made in respect of CIL charged by that authority; | £0 | |
| b | CIL collected by way of a land payment has not been spent if at the end of the reporting year— | ||
| b (i) |
development (within the meaning in TCPA 1990) consistent with a relevant purpose has not commenced on the acquired land; or | £0 | |
| b (ii) | the acquired land (in whole or in part) has been used or disposed of for a purpose other than a relevant purpose; and the amount deemed to be CIL by virtue of regulation 73(9) has not been spent; | £0 | |
| c | CIL collected by an authority includes infrastructure payments made in respect of CIL charged by that authority; | N/A | |
| d | CIL collected by way of an infrastructure payment has not been spent if at the end of the reporting year the infrastructure to be provided has not been provided; | N/A | |
| e | the value of acquired land is the value stated in the agreement made with the charging authority in respect of that land in accordance with regulation 73(6)(d); | N/A | |
| f | the value of a part of acquired land must be determined by applying the formula in regulation 73(10) as if references to N in that provision were references to the area of the part of the acquired land whose value is being determined; | N/A | |
| g | the value of an infrastructure payment is the CIL cash amount stated in the agreement made with the charging authority in respect of the infrastructure in accordance with regulation 73A(7)(e). | N/A |
s106 obligations report
| Requirement | Amount | Comment | |
|---|---|---|---|
| 3 | The matters to be included in the section 106 report for each reporting year are— | ||
| a | the total amount of money to be provided under any planning obligations which were entered into during the reporting year; | £4,081,212.43 | |
| b | the total amount of money under any planning obligations which was received during the reporting year; | £17,382,996.09 | |
| c | the total amount of money under any planning obligations which was received before the reporting year which has not been allocated by the authority; | £49,153,823.80 | (The majority of these funds have already been allocated for specific projects identified within the individual s106 agreements and/or formally committed to projects by the relevant Service Areas) |
| d | summary details of any non-monetary contributions to be provided under planning obligations which were entered into during the reporting year, including details of— | ||
| d (i) | in relation to affordable housing, the total number of units which will be provided; | 115 | |
| d (ii) | in relation to educational facilities, the number of school places for pupils which will be provided, and the category of school at which they will be provided; | 0 | CIL has replaced the policy requirement for school places. |
| e | the total amount of money (received under any planning obligations) which was allocated but not spent during the reporting year for funding infrastructure; | £1,193,483.80 | |
| f | the total amount of money (received under any planning obligations) which was spent by the authority (including transferring it to another person to spend); | £8,743,965.11 | |
| g | in relation to money (received under planning obligations) which was allocated by the authority but not spent during the reporting year, summary details of the items of infrastructure on which the money has been allocated, and the amount of money allocated to each item; | See table in Appendix 2 | |
| h | in relation to money (received under planning obligations) which was spent by the authority during the reporting year (including transferring it to another person to spend), summary details of— | ||
| h (i) | the items of infrastructure on which that money (received under planning obligations) was spent, and the amount spent on each item; | See tables in Appendix 2 | |
| h (ii) | the amount of money (received under planning obligations) spent on repaying money borrowed, including any interest, with details of the items of infrastructure which that money was used to provide (wholly or in part); | £0 | |
| h (iii) | the amount of money (received under planning obligations) spent in respect of monitoring (including reporting under regulation 121A) in relation to the delivery of planning obligations; | £147,600 | |
| i | the total amount of money (received under any planning obligations) during any year which was retained at the end of the reporting year, and where any of the retained money has been allocated for the purposes of longer-term maintenance (“commuted sums”), also identify separately the total amount of commuted sums held. | N/A | |
| 4 | The matters which may be included in the section 106 report for each reporting year are— | ||
| a | summary details of any funding or provision of infrastructure which is to be provided through a highway agreement under section 278 of the Highways Act 1980 which was entered into during the reporting year, | N/A | |
| b | summary details of any funding or provision of infrastructure under a highway agreement which was provided during the reporting year. | N/A | |
| 5 | For the purposes of paragraph 3— | ||
| a | where the amount of money to be provided under any planning obligations is not known, an authority must provide an estimate; | N/A | |
| b | a non-monetary contribution includes any land or item of infrastructure provided pursuant to a planning obligation; | N/A | |
| c | where the amount of money spent in respect of monitoring in relation to delivery of planning obligations is not known, an authority must provide an estimate. | N/A |
Appendix 1
Table 1, Town and Parish Council spend
| Parish Council | Total amount spent | Project |
|---|---|---|
| Bardsey Parish Council | £0 | N/A |
| Otley Town Council | £10,303 | Gallows Hill Nature Area - Pond, Dipping Platform and Access Improvements. |
| Clifford Parish Council | £5,216.66 | Repairs to Clifford Community Sports Ground Roof. |
| Gildersome Parish Council | £400 | Purchase of 3 new stone trough to replace broken wooden tubs. |
| Bramham cum Oglethorpe Parish Council | £0 | N/A |
| Horsforth Town Council | £24,793 | 1 Tri Mobility picnic table on Gravel surface 4m2 with HTC Plaques at Horsforth Hall Park and installation. 2 Picnic Tables with Plaques at Horsforth Hall Park and installation. Purchase and install 1x smaller 5 a-side white football post at Woodside Rec. Install a pin kerb on the path to the bandstand To area 63m x 5.5m sweep and apply tac coat. Supply lay and roll 40mm x 6mm H/S wear course. Leave flower border and current grassed area as they are. 3 benches at the Garden off Old Ball Roundabout and 3 benches at Horsforth Hall Park and installation. |
| Harewood Parish Council | £7,451.96 | Saplings for PC play area, Harewood £171.96. Play area fencing £1,300. Festive Lights £5,980. |
| Thorp Arch Parish Council | £59,272.27 | Planters £566. Noticeboard £2,970. Planters £192. Legal work for transfer of allotment land from developer £4,907. Landscaping work to allotment land £5,928. Fencing and paving to allotment land £2,400. Fencing and paving to allotment land £11,187.90. Compost bins for allotments £413.97. 2 x Speed Indication Devices £10,000. Tender Spec - Wood Lane Path £1,000. Christmas Lights £4,764.60. Noticeboard £2,100. Fencing for playground £2,860. Additional fencing for allotments £930. Trees £802.80. Wood Lane Path Work/Materials £8,250. |
| Boston Spa Parish Council | £0 | N/A |
| Walton Parish Council | £942.38 | Village Gateway Signs £246.20. Christmas Tree Lights £416.18. Playground mat lift and replace £280. |
| Morley Town Council | £51,272.25 | Christmas lights 1st instal of yr 2 of 3 yr contract £7,385.88. Festive lighting energy costs 1/12/23-6/1/24 £300.38. Building works to Station Steps £27,600. Christmas lights 2nd instal of yr 2 of 3 yr contract £4,875. Infrastructure/cabling for Chess Sq Christmas Tree £115. Christmas lights switch on service operatives £575. SEN Provision Seven Hills Primary School £6,500. Christmas lights removal/storage Yr2 of 3Y £3,605. Festive lighting energy/equipment costs 1/12/24-6/1/25 £315.99. |
| Collingham with Linton Parish Council | £97,832.99 | Development of Parish Council land - Clearance and levelling at 2 Millbeck Green £7,900. Beck Wood Rewilding project planting of trees and low level hedging £6,650. Beck Wood pathway improvements with timber edging £2,718. Beck Wood new gates and fencing £2,800. Beck Wood Car Park reduction with tarmacing, top soil and wild flower meadow installation £6,061. Pedestrian lighting installation on footpath route to Millbeck Green £5,432.52. Jubilee Playground new toddler play equipment £19,916.32. Jubilee Playground Refurbishment of existing children's playground equipment £5,109.15. Jubilee Playground (adjacent to) new Hoops and Goals equipment £14,990. New Christmas lights installed in Glebe Field £7,186. Design of Gateway signage for Parish £2,000. Car Park improvements with bollards installed at CALSA £1,000. Parish Council land new fencing project £8,620. Refurbishment to wooden footbridge over Beck £7,450. |
| Ledsham Parish Council | £0 | N/A |
| Scarcroft Parish Council | £0 | N/A |
| Micklefield Parish Council | £34,965 | Fabrication and installation of a bespoke football pitch perimeter fence £29,160. Towards the Construction of a Toddler Playground £5,805. |
| East Keswick Parish Council | £0 | N/A |
| Pool-in-Wharfedale Parish Council | £17,103.13 | Resurfacing the main playground £17,103.13. |
| Thorner Parish Council | £6,159.99 | Playground £1,600. Benches £1,785. Flood Sacks £44.99. Landscaping Open spaces £1,330. Landscaping Open spaces £1,400. |
| Aberford and District Parish Council | £0 | N/A |
| Drighlington Parish Council | £12,339.72 | D Day Events Equipment £5,327.72. Christmas Lights and signs £6,732. Christmas Tree £280. |
| Bramhope and Carlton Parish Council | £168,962.68 | Pavillion project fees £5,468.89. Building works for extension and refurbishment of Pavillion £158,677.47. Pavillion fixtures and fittings £4,038.72. Pavillion temporary washroom facilities £777.60. |
| Alwoodley Parish Council | £0 | N/A |
| Barwick and Scholes Parish Council | £0 | N/A |
| East Keswick Parish Council | £0 | N/A |
| Great and Little Preston Parish Council | £0 | N/A |
| Kippax Parish Council | £0 | N/A |
| Ledsham Parish Council | £0 | N/A |
| Shadwell Parish Council | £0 | N/A |
| Wetherby | £0 | N/A |
Table 2, Community committee spend
Inner North East
| Spend breakdown | Project |
|---|---|
| £6,750 | Chapel Allerton Allotment Gardeners Association (Replacement of Toilet Facilities). |
| £5,763 | Chapel Allerton Festival Lights. |
| £10,000 | Roundhay Tennis Courts. |
| £3,000 | YAA Community Remembrance and Reflection Garden. |
| £5,548 | Oakwood and Street Lane Christmas Lights. |
| £20,000 | Gledhow Valley Play Area. |
| Total: £51,061 |
Inner East
| Spend breakdown | Project |
|---|---|
| £19,896 | Wellbeing Garden for community use at St Patrick’s School. |
| £8,666.66 | CCTV Camera on Harehills Lane/Conway Place. |
| £3,047.70 | CCTV at Parkway Towers. |
| £4,000 | CCTC at Black Shops, The Rein and The Dennis Healey Centre. |
| Total: £35,610.36 |
Inner North West
| Spend breakdown | Project |
|---|---|
| £1,500 | Meanwood Christmas light switch on (Weetwood) stage hire. |
| £4,784.98 | Hyde Park Football Club Goalposts (HHP Ward). |
| £17,410 | Christmas Lights Headingley Hyde Park, Little London and Woodhouse and Weetwood. |
| £8,400 | Heart Centre Front Door Repairs (HHP Ward). |
| £100,000 | St Paul’s Church Hall Roof repairs (Church Hall used for community activities, youth club, food bank). |
| £5,000 | SID Device Wynford Avenue (Weetwood). |
| £19,203.80 | Bedford Fields Forest Garden Upgrade (HHP). |
| £15,500 | Equipment for Community Streets Project (street improvements in Woodhouse and Hyde Park). |
| £8,250 | Welcome In Garden Project (Weetwood). |
| £40,000 | Heart Centre Boiler Replacement (HHP). |
| £10,000 | Hyde Park Source Kitchen Upgrade (HHP). |
| £9,200 | Hyde Park Football Club Kitchen refurb (HHP). |
| £10,000 | St Chad’s Broomfield Table cricket (Weetwood). |
| £3,032 | Banners promoting good behaviour for the Otley Run. |
| £7,500 | Pedal powered bikes for smoothies at community events (Roadblock CIC). |
| Total: £259,780.78 |
Inner South
| Spend breakdown | Project |
|---|---|
| £1,170 | Sussex Green - Vegetation Clearance. |
| £128 | Replacement defibrillator pads at Hunslet Church of Nazarene. |
| £1,000 | Installation of bollards at Royal Close. |
| £3,530 | Additional fitness equipment in Cross Flatts Park. |
| £1,000 | Additional play equipment on Hunslet Moor. |
| £413 | Replacement defibrillator pads at battery Hardy Street Community Centre. |
| £795.92 | Royal Grove Shrubs and Grass. |
| £5,350 | Removal of bushes at Northcote Drive. |
| £1,102.08 | Repairs to community notice boards, Church Street, Hunslet Lake and Pepper Road. |
| £199.14 | Grit bins (refill) on Montcalm Crescent and Woodhouse Hill Road. |
| £975 | Flaxton Close security gate. |
| £199.14 | Grit bins (refill) on Montcalm Crescent and Woodhouse Hill Road. |
| £3,576.04 | Hunslet Square Reinforced Seating. |
| £3,576.04 | Involve play equipment. |
| £516 | 2 litter bins at Coupland Place and Disraeli Terrace. |
| £3,025 | Dog fouling signs (Hunslet and Riverside Ward). |
| £6,000 | CCTV Cameras in Tempest Road, Maud Avenue, Crossflatts Park, St Matthew's Church. |
| £1,500 | Hunslet Carr Backstop Netting. |
| £3,000 | Litter Picking Equipment for community groups. |
| £350 | Waterways Graffiti Mural. |
| £90 | Inner South Colostomy Shelves at St George's Centre. |
| £180 | Inner South Colostomy Shelves at Dewsbury Road Hub and Hunslet Hub. |
| £1,500 | Hunslet Square Play Area Markings. |
| £20,000 | Hunslet Club Eco Gym. |
| £1,560 | Upgrading Clubhouse Electrics and Lighting at Beeston Juniors Football Club. |
| £1,650 | Involve Community Centre Notice Board. |
| £3,720 | Hunslet TARA Christmas Lights. |
| £4,483 | Hunslet Carr Christmas Lights. |
| £8,750.68 | Hunslet Moor Vegetation Cut Back. |
| £9,000 | Hunslet Moor Play Equipment. |
| £13,260.68 | Fitness Equipment in Cross Flatts Park. |
| £9,133 | Beeston and Holbeck Festive Lights. |
| £1,984.40 | Belle Isle Circus Lighting Column. |
| £12,720 | Middleton Park Christmas Lights. |
| £5,000 | Pride Place Equipment (chairs and IT equipment for new community space). |
| £25,000 | Minibus Replacement for Hamara. |
| £7,000 | Golden Lion Refurbishment. |
| £4,720 | Equipment to film 'From Bangladesh to Beeson'. |
| £33,331.84 | Cottingley MUGA lighting. |
| £1,200 | Middleton Park Boulders. |
| £1,200 | Royal Grove Fencing. |
| £15,000 | Penny Pocket Park. |
| £15,000 | Asha Neighbourhood Project building and equipment improvements. |
| £5,000 | Hunslet Sign and Railway axles. |
| £5,000 | Dog Fouling and Fly Tipping Signs in Middleton Park Ward. |
| £2,500 | Installing Grit and Litter Bins in Hunslet and Riverside Ward. |
| £1,000 | Equipment for the Mums and Tots Group at Beeston Hill United Church. |
| £5,104.36 | Resurfacing of footway at Braithwaite Row. |
| £10,000 | Brett Gardens Compound improvements. |
| £15,000 | Hunslet Moor Depot improvements. |
| £4,480 | Replacement Doors at Hunslet Church of Nazarene. |
| £6,086.95 | Benches at Hunslet Moor. |
| £5,580 | Hunslet District Centre - History Panels. |
| £3,990 | Royal Grove and Royal Court Shrubbery Clearance. |
| £5,000 | Speed Indicator Device at Moor Road. |
| £4,978.80 | Involve Centre Improvements. |
| £1,828.64 | Community Hub (The Loft) community centre on Crosby Road. |
| Total: £312,540.47 |
Inner West
| Spend breakdown | Project |
|---|---|
| £10,876.64 | Tennis Court Improvements – Burley Park. |
| £36,000 | Stanningley Park MUGA Resurfacing. |
| £9,160 | New Wortley Community Centre Strengthening Local Connections and Centre Refurb Project. |
| £7,018.50 | Armley Christmas Lights. |
| £3,903.42 | Grit Bins (Armley, Bramley and Stanningley and Kirkstall). |
| £13,510.41 | Gilbert and Sandford external railings painting. |
| £6,000 | CCTV (Ley Lane, Broadlea Grove, Broadlea Hill, Hawksworth Wood and Cragside Rec). |
| Total: £86,468.97 |
Outer East
| Spend breakdown | Project |
|---|---|
| £3,800 | Garforth Leisure Centre Security Improvements. |
| £8,500 | Firthfields Recreation Ground Security Improvements. |
| Total: £12,300 |
Outer South
| Spend breakdown | Project |
|---|---|
| £5,580 | Market Stalls in Rothwell Park for use for local events. |
| £8,289 | Rothwell Christmas Lights. |
| £15,344 | Rothwell Christmas Lights. |
| £2,200 | Hedge Removal at Leventhorpe Way. |
| £10,500 | Christmas tree in Ardsley and Robin Hood Ward. |
| Total: £41,913 |
Outer North West
| £2,000 | Leeds Modernians Ruby Training Ground – landscaping and provision of storage for equipment. |
| £2,822.42 | Temporary facilities at High Royds Cricket Ground 2024 – Portacabin/changing facilities and storage. |
| £8,000 | Micklefield Park Bowling Green Pavillion Toilets Upgrade. |
| £10,000 | Adel Churchyard Appeal - Tree Replacement. |
| £7,902.40 | Rawdon Community Library Main Door and Frontage. |
| £4,330.50 | Guiseley Christmas Lights 2024 + Xmas Tree at Towngate. |
| £20,000 | New changing facilities for Adel War Memorial Association (AWMA) Hockey Club. |
| £5,000 | LED Conversion of Theatre Lighting System for Adel Players (AWMA). |
| £3,261.87 | Playground Resurfacing Project (2 playgrounds). |
| £4,311.88 | Yeadon Town Hall Theatre – Refurbishment of Stone Steps. |
| £2,500 | Arthington Parish Council Solar Speed Indicator Device (SID). |
| £6,000 | Restoration of the Arbour at York Gate Garden. |
| £2,584 | LED Conversion of Theatre Lighting System (DMX network bid) for Adel Players (AWMA). |
| £2,240 | AWMA Fencing adjacent to pitch. |
Appendix 2: s106 Spend
Greenspace
| Ward | Planning reference | Application site | ||
|---|---|---|---|---|
| Headingley and Hyde Park | 13/00868/OT | Victoria Road, Headingley | Royal Park - greenspace enhancement | £60,818.15 |
| Headingley and Hyde Park | 18/02754/FU | 38 North Grange Road | Royal Park - greenspace enhancement | £13,334.16 |
| Headingley and Hyde Park | 15/00565/FU | Cockcroft House, Cardigan Road | Royal Park - greenspace enhancement | £5,696.58 |
| Headingley and Hyde Park | 18/05854/FU | One Stop, 187 Woodhouse Street | Royal Park - greenspace enhancement | £1,020.87 |
| Little London and Woodhouse | 15/04327/FU | Woodhouse Street, Woodhouse | Royal Park - greenspace enhancement | £14,070.24 |
| Little London and Woodhouse | 10/00874/OT | 4-28 Westfield Road | Royal Park - greenspace enhancement | £8,286.39 |
| Little London and Woodhouse | 13/04862/FU | Former Police Garages and St Michaels College | Royal Park - greenspace enhancement | £142,455 |
| Little London and Woodhouse | 20/447/03/FU | Concept House Park Lane | Royal Park - greenspace enhancement | £7,507.33 |
| Little London and Woodhouse | 10/05548/EXT | Moorland Road, Woodhouse | Royal Park - greenspace enhancement | £10,255.32 |
| Little London and Woodhouse | 10/00874/OT | 2-28 Westfield Road | Royal Park - greenspace enhancement | £2,626.28 |
| Little London and Woodhouse | 10/05548/EXT | Moorland Road, Woodhouse | Royal Park - greenspace enhancement | £13,658.48 |
| Little London and Woodhouse | 12/03371/FU | Site of Former Glassworks Cardigan Road | Burley Lodge Park - play area improvements | £37,028.83 |
| Killingbeck and Seacroft | 15/00903/FU | Asket Drive | The Rein - greenspace improvements | £10,146 |
| Morley South | 13/00902/OT | Land at Owlers Farm | Glen Road - changing room refurb | £3,255.26 |
| Middleton Park | 16/03861/FU | Land at Towcester Avenue Throstle and Thorpe Road | Middleton Park ward - greenspace improvements | £25,393 |
| Pudsey | 11/04868/FU | Land at Waterloo Road and Gibraltar Road | Pudsey ward - greenspace improvements | £507 |
| Kippax and Methley | 16/02898/FU | Manor House Farm | Micklefield greenspace improvements | £24,160.55 |
| Wetherby | 13/03051/OT | Spofforth Hill | Harland Way and Deepdale play area improvements | £3,182 |
| Little London and Woodhouse | 10/00407/FU | St Mark's Residence, St Mark's Street | Woodhouse Moor - fencing, paths and planting | £3,740 |
| Beeston and Holbeck | 17/02506/FU | 116 Domestic Street, Holbeck | Holbeck Moor improvements | £3,660 |
| Horsforth | 14/01523/FU | Horsforth Mill | Newlaithes POS - play area creation | £6,081.85 |
| Kippax and Methley | 15/07360/OT | Station House, Station Road | Church Lane playing fields, Methley | £3,630 |
| Weetwood | 17/06427/FU | Former site of West Park Centre, Spen Lane | West Park fields - play area | £3,280.14 |
| Otley and Yeadon | 09/04287/RM | Garnetts Paper Mills, Mill Lane | Marshall St and Henshaw Oval - play area improvements | £82,237.45 |
| Otley and Yeadon | 13/03022/FU | Former Wharfedale Hospital Newall Carr Road | Marshall St and Henshaw Oval - play area improvements | £17.08 |
| Middleton Park | 18/04240/FU | Bodmin Road, Middleton | Middleton Park environmental schemes | £800 |
| Killingbeck and Seacroft | 16/07382/FU | Seacroft Crescent | King George's memorial garden, Seacroft | £660 |
| Headingley and Hyde Park | 15/00923/FU | Former Leeds Girls High School | Woodhouse Ridge and Sparrow Park improvements | £71,448 |
| Little London and Woodhouse | 16/06312/FU | Blenheim Court | Blenheim Square improvements | £83,230 |
| Morley North | 13/00625/FU | Land off Daisy Hill Close, Morley | Churwell Woods - steps | £348.18 |
| Kirkstall | 18/01320/FU | Former Rising Sun, 290 Kirkstall Road | Wolseley Rd POS - play area improvements | £651.50 |
| Morley South | 13/00902/OT | Land at Owlers Farm | Magpie Lane Rec and Old Wide Lane - fencing and gates | £4,575 |
| Farnley and Wortley | 18/04168/FU | Former Wortley High School | Western Flatts - play area improvements | £196,240.63 |
| Kirkstall | 13/01602/EXT | Former Boston Diner St Anns Lane | Sandford Road rec, Cragside rec, Burley Park | £34,087.66 |
| Kirkstall | 24/15/99/FU | Sandford Road | Sandford Road rec, Cragside rec, Burley Park | £10,407.40 |
| Kirkstall | 06/06512/FU | Former Bus Deport Kirkstall Lane | Sandford Road rec, Cragside rec, Burley Park | £4,592.94 |
| Morley South | 13/00902/FU | Land at Olwers Farm | Denshaw Grove - fencing | £6,940 |
| Calverley and Farsley | 13/04824/OT | Land near Ring Road Farsley | Calverley and Farsley Rec - play area imps | £6,500 |
| Ardsley and Robin Hood | 12/00161/FU | Land off Milner Lane | Ardsley and Robin Hood ward - play area improvements | £3,397 |
| Headingley and Hyde Park | 26/98/05/FU | 14-16 St Michaels Lane and St Michael's Gove | Littlemoor POS - greenspace improvements | £9,114.55 |
| Headingley and Hyde Park | 10/03603/FU | The Former Lounge Cinema North Lane | Littlemoor POS - greenspace improvements | £3,593.48 |
| Otley and Yeadon | 13/03022/FU | Former Wharfedale Hospital Newall Carr Road | Otley and Yeadon ward - play area improvements | £62,695.95 |
| Otley and Yeadon | 09/00349/FU | Prince Henry's School Annexe | Otley and Yeadon ward - play area improvements | £39,304.05 |
| Wetherby | 13/03051/OT | Spofforth Hill | Deepdale playground - improvements and access | £28,100 |
| Kippax and Methley | 13/05235/FU | Park Lane, Allerton Bywater | Allerton Bywater - sports pitches | £12,565 |
| Harewood | 13/01857/FU | Castle Mona Lodge | Scarcroft playground improvements | £3,000 |
| Bramley and Stanningley | 13/03007/FU | Land and Premises opposite 60 to 80 Half Mile Lane | Stanningley Park multi-use games area | £5,000 |
| Little London and Woodhouse | 20/01478/FU | Carlton Hill Student Residences | Tennant Hall - play area refurb | £123,379.70 |
| Little London and Woodhouse | 20/01478/FU | Carlton Hill Student Residences | Tennant Hall - play area refurb | £10,637.83 |
| Little London and Woodhouse | 18/01805/FU | Leeds College of Building The Millwright Building | Oatland Drive play area | £78,467 |
| Little London and Woodhouse | 20/01478/FU | Carlton Hill Student Residences | Woodhouse Moor - footpath improvements | £43,419.75 |
| Little London and Woodhouse | 14/06430/FU | Holborn Court | Woodhouse Moor - footpath improvements | £11,866.50 |
| Burmantofts and Richmond Hill | 21/08380/FU | Former Richmond Hill Community Club | Torre Mount Rec - multi-use games area and Rockwood Rec refurb | £3,291.54 |
| Burmantofts and Richmond Hill | 08/03378/OT | Knowsthorpe Crescent/Cross Green Lane | Torre Mount Rec - multi-use games area and Rockwood Rec refurb | £74,439.86 |
| Pudsey | 17/08294/FU | Land off Tyersal Close | Tyersal Park multi-use games area | £1,315.27 |
| Armley | 11/04358/FU | Land off Broad Lane | Jailey Fields - improvements | £8,773 |
| Temple Newsam | 16/07340/FU | Kendal Drive/Rathmell Road | Grove Road Rec - tennis courts refurb | £2,300 |
| Weetwood | 13/02893/FU | Sandfield House, Sandfield Avenue | The Hollies - tennis courts refurb | £28,867.16 |
| Temple Newsam | 16/07340/FU | Kendal Drive/Rathmell Road | Grove Road rec - multi-use games area | £14,317 |
| Killingbeck and Seacroft | 15/07300/FU | Land at Seacroft Hospital | Seacroft environmental improvements | £3,267.95 |
| Wetherby | 13/03051/OT | Spofforth Hill | Milnthorpe Way and Harland Way link footpath | £5,480 |
| Killingbeck and Seacroft | 16/07453/FU | Kentmere Approach/Former Asket Primary School | The Rein and parkland pitch improvements | £293 |
| Killingbeck and Seacroft | 15/07300/FU | Land at Seacroft Hospital | Seacroft Gardens - play area | £7,942.41 |
| Bramley and Stanningley | 16/00937/FU | Bramley Liberal Club, 14 Hough Lane | Stanningley Park - bowling club refurb | £1,909.89 |
| Morley North | 13/00625/FU | Land off Daisy Hill Close, Morley | Street Lane rec - signage | £220 |
| Calverley and Farsley | 18/06137/FU | Ross Studios, Rodley Lane | Brookfield Rec - play area, paths and trees | £21,445 |
| Moortown | 19/05419/FU | Land off Queenshill Avenue and Queenshill View | Stonegate Road - access improvements | £70,000 |
| Beeston and Holbeck | 19/03367/FU | Land off Moorhouse Avenue and Old Lane | Beggars Hill rec - play area improvements | £30,429 |
| Calverley and Farsley | 18/06137/FU | Ross Studios, Rodley Lane | Rodley Park - play area improvements | £9,327 |
| Kirkstall | 11/03274/FU | 2 Bridge Road, Kirkstall | Kirkstall Abbey - access improvements | £35,592 |
| Pudsey | 17/08294/FU | Land off Tyersal Close | Tyersal Park - play area improvements | £2,300 |
| Moortown | 19/05419/FU | Land off Queenshill Avenue and Queenshill View | Stretton Avenue - play area improvements | £16,258.56 |
| Crossgates and Whinmoor | 08/00298/OT | Optare, Manston Lane, Cross Gates | Farndale play area, Swarcliffe - improvements | £30,525.71 |
| Beeston and Holbeck | 19/03367/FU | Land off Moorhouse Avenue and Old Lane | Cross Flatts Park - greenspace improvements | £2,091.80 |
| Gipton and Harehills | 07/01012/FU | Site 4, Thorn Walk, Site 5 Oak Tree/Amberton Road | Gipton Square - playground refurb | £9,542.28 |
| Ardsley and Robin Hood | 12/02974/RM | Land to rear of 7 Waterwood Close | Lofthouse Rec - improvements | £10,114.32 |
| Little London and Woodhouse | 20/02958/FU | Caroline House, Diamond House, Sheepscar Street South | Lovell Park - improvements | £13,309.05 |
| Total | £1,744,421.88 |
Affordable housing
| Ward | Planning reference | Application site | Project | Amount spent |
|---|---|---|---|---|
| Wetherby | 13/03051/OT | Spofforth Hill | Grant for Colliers Park (Sugar Hill Close) affordable rent/shared ownership scheme | £2,824,553 |
| Total | £2,824,553 |
Highways
| Ward | Planning reference | Application site | Project | Amount spent |
|---|---|---|---|---|
| Morley North | 12/04048/FU | Land off Daisy Hill, Morley | Officer time for Design/consultation works for footway/cycleway works. | £7,111.86 |
| Kippax and Methley | 13/02771/OT | Land off Great North Road, Micklefield | Lockit-Safe cycle storage for Micklefield Primary School. | £1,068.63 |
| Headingley and Hyde Park | 19/04884/FU | Former Elinor Lupton Centre, Richmond Road, Headingley, LS6 | Highways works and pedestrian crossing on Headlingley Lane. | £100,000 |
| Little London and Woodhouse | 20/02803/FU | Commerce House, St Albans Place, Leeds | Merrion Street/Great George Street scheme. | £127,126 |
| Wetherby | 13/03051/OT | Land at Spofforth Hill, Wetherby | Spofforth Hill Scheme. | £90,000 |
| Hunslet and Riverside | 17/02501/OT | Tetley Brewery, Hunslet Road, LS10 | Meadow Lane- Traffic Management Scheme. | £585,213.75 |
| Little London and Woodhouse | 20/01965/FU | Former Santander Uk, 44 Merrion Street, Leeds, LS2 | Merrion Street/Great George Street scheme. | £449,253.73 |
| Little London and Woodhouse | 21/06759/FU | 26-34 Merrion Street, LS2 | Merrion Street/Great George Street scheme. | £56,971.05 |
| Garforth and Swillington | 15/07655/OT | Land To East Of Junction 45 Of The M1 Motorway And South Of Pontefract Lane, Leeds | Resurfacing of Newsam Green Road. | £236,699.35 |
| Kirkstall | 19/01666/FU | Land Off Kirkstall Hill, Kirkstall, Leeds, LS5 3BH | Traffic regulation order. | £50,000 |
| Harewood | 21/00444/FU | Moor Allerton Golf Club, Coal Road Wike Leeds LS17 | Construction traffic damage repair on Coal Road. | £22,093.02 |
| Wortley and Farnley | 18/00251/FU | Snittles Farm, Gelderd Road, Wortley | Traffic regulation order. | £8,247.73 |
| Morley North | 21/01505/FU | Land At Seacroft Hospital | A64 York Road Bus Priority improvements. | £198,431.51 |
| Little London and Woodhouse | 23/07471/FU | Centaur House 91 Great George Street | Loading Bay. | £10,000 |
| Pudsey | 22/08014/FU | Land West Of Kent Road, Pudsey, LS28 | Traffic regulation order and associated traffic management measures. | £40,000 |
| Little London and Woodhouse | 23/03392/FU | 24-28 Great George Street, Leeds, LS1 3DL | Merrion Street/Great George Street scheme. | £41,000 |
| Kippax and Methley | 33/311/00/OT | Former Colliery Site Park Lane Station Road and Barnsdale Road Allerton Bywater | Various community initiatives for Allerton Bywater. | £10,000 |
| Harewood | 06/04908/FU | Land adj to Stub Farm House, Harewood Estate, Harrogate Road, LS17 | Various community initiatives for Harewood Ward. | £124,481 |
| Crossgates and Whinmoor | 17/01858/FU | Land at Bramley Gardens, Skelton Lane, Whinmoor | Cycle vouchers. | £2,400 |
| Temple Newsam | 16/07348/FU | Land at Wykebeck Mount/Avenue, Osmondthorpe, LS9 | Cycle Vouchers. | £3,303.65 |
| Wetherby | 13/03196/FU | Land Off Grove Road, Boston Spa, Wetherby | Mcards/Cycle Vouchers. | £27,730 |
| Bramley and Stanningley | 16/06514/FU | Land Off Galloway Lane, Stanningley | Cycle Vouchers/Walking Equipment. | £5,972.60 |
| Seacroft | 15/07300/FU | Land At Seacroft Hospital York Road | Cycle Vouchers. | £2,000 |
| Killingbeck and Seacroft | 17/06427/FU | Former site of West Park Centre, Spen Lane, LS16 | Cycle Vouchers. | £10,957 |
| Killingbeck and Seacroft | 16/07453/FU | Kentmere Approach/Former Asket Primary School | Cycle Vouchers. | £2,400 |
| Beeston and Holbeck | 17/07963/OT | Sweet Street, Holbeck | Cycle vouchers/Leeds City Bike rental vouchers. | £5,619 |
| Otley and Yeadon | 16/06770/FU | Land Off Meagill Rise, Otley, LS21 | Mcards. | £3,031.35 |
| Hunslet and Riverside | 16/01115/FU | Granary Wharf Car Park, 2 Canal Wharf, LS11 | Mcards. | £14,487.60 |
| Killingbeck and Seacroft | 19/00067/FU | Former Killingbeck Police Station, Foundry Lane, Seacroft | Mcards. | £18,768.37 |
| Morley North | 18/00251/FU | Snittles Farm, Gelderd Road | Cycle Vouchers/Rail Tickets/Mcards. | £15,230 |
| Killingbeck and Seacroft | 16/07348/FU | Wykebeck Mount/Avenue, LS9 | Cycle Vouchers and Mcards. | £24,248.65 |
| Wetherby | 18/07278/FU | Land at Rudgate Park, Walton | Mcards. | £13,013 |
| Killingbeck and Seacroft | 15/07300/FU | Land At Seacroft Hospital York Road | Cycle vouchers. | £2,000 |
| Hunslet and Riverside | 15/00415/FU | South Accommodation Road, Hunslet | Car Club membership/use. | £5,714.01 |
| Killingbeck and Seacroft | 16/07381/FU | Brooklands Avenue, Brooklands Drive And Parkway Close, Seacroft | Cycle voucher. | £500 |
| Hunslet and Riverside | 14/05976/OT | Land at former YEP building, Wellington Street | Car Club membership/use. | £6,868.14 |
| Beeston and Holbeck | 17/07963/OT | Land Off Sweet Street, Holbeck | Car Club membership/use | £5,000 |
| Kippax and Methley | 19/05296/FU | Land Off Pit Lane, Micklefield, LS25 | Cycle Vouchers + Rail Tickets. | £25,115 |
| Hunslet and Riverside | 18/02481/FU | Land At The Former Doncaster Monk Bridge Works | Car Club membership/use. | £10,000 |
| Horsforth | 19/05272/FU | Horsforth Campus, Calverley Lane, Horsforth | Mcards/Cycle vouchers. | £47,730 |
| Killingbeck and Seacroft | 19/00067/FU | Former Killingbeck Police Station, Foundry Lane, Seacroft | Mcards. | £18,768.37 |
| Kippax and Methley | 15/01973/FU | Land East Of Great North Road, Micklefield | Mcards. | £20,000 |
| Garforth and Swillington | 17/05759/OT | Land To South Of Selby Road, Garforth | Cycle Vouchers/Rail Tickets/Mcards. | £15,115 |
| Kippax and Methley | 20/05669/RM | Land off Church Lane, Micklefield, LS25 | Lockit-Safe cycle storge for Micklefield Primary. | £6,245.37 |
| Chapel Allerton | 19/01665/FU | Land Off Beckhill Approach, Meanwood | Metrocards + Cycle Vouchers. | £25,462.50 |
| Morley North | 16/07987/OT | Pitty Close Farm, Wakefield Road, Drighlington, BD11 | Cycle Vouchers/Mcards/Leeds city bike passes. | £40,517.50 |
| Rothwell | 18/00370/OT | Land Off Main Street, Carlton | Mcards/Cycle vouchers. | £15,115 |
| Killingbeck and Seacroft | 16/07442/FU | Bishops Way, Seacroft, LS14 | Mcards/Cycle vouchers. | £15,230 |
| Ardsley and Robin Hood | 17/08262/OT | Land off Haigh Moor Road | Mcards/Walking Equipment/Cycle Vouchers/Car Club. | £32,945 |
| Hunslet and Riverside | 16/07714/FU | Doncaster Monk Bridge, Whitehall Road | Metrocards + Cycle Vouchers. | £50,000 |
| Hunslet and Riverside | 16/07714/FU | Doncaster Monk Bridge, Whitehall Road | Car Club membership/use. | £7,500 |
| Farnley and Wortley | 16/05912/OT | Land at Whitehall Road, LS12 | Mcards/Cycle vouchers. | £25,345 |
| Killingbeck and Seacroft | 21/01505/FU | Land at Seacroft Hospital (Phase 3) | Mcards/Walking Equipment/Cycle Vouchers. | £17,506 |
| Wetherby | 17/07970/OT | Land Off Walton Road, Walton | Mcards/Walking Equipment/Cycle vouchers. | £15,115 |
| Killingbeck and Seacroft | 21/01505/FU | Land at Seacroft Hospital (Phase 3) | Mcards/Walking Equipment/Cycle vouchers. | £20,339 |
| Adel and Wharfedale | 16/06222/OT | East of Otley Road, Adel, LS16 | Mcards/Cycle vouchers. | £20,230 |
| Rothwell | 21/01796/FU | Former Minerva Works And Glenoit Mills, Aberford Road, Woodlesford | Mcards/Cycle Vouchers/Rail Tickets. | £9,040 |
| Rothwell | 19/03590/FU | Tower Works, Globe Road, Holbeck, LS11 | Rail Tickets. | £5,000 |
| Headingley and Hyde Park | 21/03265/FU | Belmont House, Round House And Coach House, 20 Wood Lane, Headingley | Mcards. | £12,276 |
| Wetherby | 14/00315/OT | Land At Leeds Road, Collingham, Wetherby | Mcards. | £5,115 |
| Little London and Woodhouse | 18/02152/FU | Land Former Burley Community Sports and Social Burley Club, Burley Road | Mcards/Cycle vouchers. | £27,845 |
| Morley North | 16/02988/OT | Lane Side Farm, Victoria Road, Churwell | Mcards/Cycle vouchers/Rail Tickets. | £15,115 |
| Garforth and Swillington | 15/07655/OT | Land To East Of Junction 45 Of The M1 Motorway And South Of Pontefract Lane, LS9 | Mcards/Cycle vouchers. | £10,115 |
| Garforth and Swillington | 15/07655/OT | Land To East Of Junction 45 Of The M1 Motorway And South Of Pontefract Lane, LS9 | Mcards/Cycle vouchers. | £15,115 |
| Kirkstall | 19/01666/FU | Land Off Kirkstall Hill, Kirkstall | Mcards/Cycle vouchers/Car Club. | £42,542.50 |
| Burmantofts and Richmond Hill | 21/08380/FU | Former Richmond Hill Community Club, Railway Street, Richmond Hill | Mcards/Cycle vouchers/Car Club. | £14,985.64 |
| Wetherby | 14/00611/FU | Land at Sandbeck Way, Wetherby | Night Bus Pilot Scheme. | £13,800 |
| Crossgates and Whinmoor | 21/05617/FU | Land Off Swarcliffe Avenue And Stanks Gardens, Leeds, LS14 | Bus stop relocation. | £13,000 |
| Garforth and Swillington | 15/07655/OT | Land To East Of Junction 45 Of The M1 Motorway And South Of Pontefract Lane, Leeds | Bus service. | £89,916.18 |
| Temple Newsam | 21/00654/FU | Land East Of Railway Line, Halton Moor Avenue, Halton | Bus stop relocation. | £13,450.67 |
| Garforth and Swillington | 15/07655/OT | Land To East Of Junction 45 Of The M1 Motorway And South Of Pontefract Lane, Leeds | Bus service. | £117,477.78 |
| Temple Newsam | 16/07340/FU | Kendal Drive/Rathmell Road, Halton | Real time bus information display. | £12,703.58 |
| Heaadingley and Hyde Park | 11/03234/FU | Tetley Hall, Burton Crescent, Headingley, LS6 4DN | Bus stop. | £17,043.48 |
| Rothwell | 17/06933/FU | 1 Wordsworth Drive (Sugar Hill Close) | Bus stop. | £11,761.19 |
| Total | £3,201,521.76 |
Education
| Ward | Planning reference | Application site | Project | Amount spent |
|---|---|---|---|---|
| Temple Newsam | 12/01422 | Temple Point, Bullerthorpe Road | School Improvement Works at Temple Moor High School. | £156,100.58 |
| Total | £156,100.58 |
Biodiversity
| Ward | Planning reference | Application site | Project | Amount spent |
|---|---|---|---|---|
| Ardsley and Robin Hood | 20/06103/FU | Acanthus Golf Club, Thorpe Lane, Tingley | BNG Monitoring and Support; Dolphin Beck Marsh Management Plan 2025-2055. | £30,000 |
| Hunslet and Riverside | 21/08295/FU | Land at Former Doncaster Monk Bridge Works | BNG Monitoring and Support; Armley Park Management Plan 2024-2054; Implementation and habitat monitoring works (30 years). | £16,500 |
| Killingbeck and Seacroft | 21/01505/FU | Land at Seacroft Hospital | BNG Monitoring and Support; Limepit Woods, Ramshead Woods, Low Woods and Asket Hill Management Plan 2024-2054; Implementation and habitat monitoring (30 years). | £574,783.89 |
| Killingbeck and Seacroft | 22/02298/FU | Land off Brooklands Avenue, Seacroft | BNG Monitoring and Support, Wykebeck Valley Road Management Plan 2024-2054; Implementation and habitat monitoring 30 years. | £49,500 |
| Gipton and Harehills | 22/02324/FU | Amberton Crescent, Amberton Terrace and Amberton Street | BNG Monitoring and Support; Wykebeck Valley Road Management Plan 2024-2054; Implementation and Monitoring (30 years). | £57,800 |
| Killingbeck and Seacroft | 22/00903/FU | Land at Seacroft Hospital | Limepit Woods, Ramshead Woods, Low Woods and Asket Hill Management Plan 2024-2054. | £5,800 |
| Pudsey | 23/06663/FU | Former Hough Side High School Site, Hough Top | Post Hill Management Plan. | £12,500 |
| Rothwell | 21/01796/FU | Former Minerva Works and Glenoit Mills, Aberford Mills | Dolphin Beck Marsh Management Plan 2025-2055. | £6,540 |
| Armley | 19/01670/FU | Land off Cockshott Lane, Armley | Implementation and Habitat Monitoring at Armley Park. | £63,944 |
| Total | £817,368 |
Items of Infrastructure on which s106 money was allocated
Greenspace
| Ward | Planning reference | Application site | Project | Amount spent |
|---|---|---|---|---|
| Burmantofts and Richmond Hill | 08/03378/OT | Knowsthorpe Crescent/Cross Green Lane | Playground refurbishments at Rookwood Recreation Ground and Torre Mount Pocket Parks. | £74,439.46 |
| Pudsey | 17/08294 | Land Off Tyersal Close | Bowling club boiler and MUGA tennis court lining at Tyersal Park. | £1,325 |
| Killingbeck and Seacroft | 15/07300 | Land At Seacroft Hospital | Removal of play equipment at Seacroft Gardens. | £7,942.71 |
| Middleton Park | 22/462/04 | Junction Of Sharp Lane And Sharp House Road | Access and safety improvements at Laurel Place Middleton. | £6,000 |
| Armley | 11/04358 | Land Off Broad Lane, Bramley | New Play Area at Jailey Fields. | £8,865 |
| Armley | 11/04358 | Land Off Broad Lane, Bramley | New Play Area at Jailey Fields. | £29,158.97 |
| Weetwood | 13/02893 | Sandfield House, Sandfield Avenue | Refurbishment of Tennis Courts at The Hollies, Weetwood. | £31,488.12 |
| Temple Newsam | 16/07340 | Kendal Drive/Rathmell Road, Halton | Improvements to the sports courts at Grove Road Rec Ground. | £5,419.72 |
| Temple Newsam | 16/07340 | Kendal Drive/Rathmell Road, Halton | MUGA fencing at Grove Road Rec Ground. | £14,117 |
| Killingbeck and Seacroft | 15/07300 | Land At Seacroft Hospital | Seacroft green muga flood lights, Parklands path, Parklands storage and planning permission, Seacroft village green Christmas tree parks. | £36,663.54 |
| Wetherby | 13/03051 | Spofforth Hill | Redevelopment of Sandringham Play area. | £50,000 |
| Wetherby | 13/03051 | Spofforth Hill | Additional footpath link Milnthorpe Way and The Harland Way. | £70,000 |
| Killingbeck and Seacroft | 16/07453 | Kentmere Approach/Former Asket Primary | Access improvements at Parklands Playing Fields. | £50,000 |
| Killingbeck and Seacroft | 15/00903 | Asket Drive | Access and Signs Improvements at The Rein. | £20,000 |
| Wetherby | 13/03051 | Spofforth Hill | Tree Planting and sign at Wetherby Ings. | £10,280 |
| Hunslet and Riverside | 17/02677 | Leeds Beckett University, Portland Way | Tree planting proposal at Civic Hall. | £6,800 |
| Bramley and Stanningley | 16/00937 | Bramley Liberal Club, 14 Hough Lane | Bowling club improvements at Stanningley Park. | £1,909.89 |
| Ardsley and Robin Hood | 15/07565 | Land At Former Primary School And White Horse Pub | Play Area at Moor Knoll. | £1,107.57 |
| Beeston and Holbeck | 19/03367 | Land Off Moorhouse Avenue And Old Lane | Beggars Hill Recreation Ground. | £36,514.11 |
| Calverley and Farsley | 18/06137 | Ross Studios, Rodley Lane | Paths, Play areas and trees at Brookfield Rec. | £34,279.92 |
| Morley North | 13/00625 | Land off Daisy Hill Close, Morley | MUGA Signs at Street Lane. | £220 |
| Moortown | 19/05419 | Land Off Queenshill Avenue and Queenshill View | Access improvements to the field off Stonegate Road. | £70,000 |
| Garforth and Swillington | 07/1208 | Land At 87 Selby Road, Garforth | Metal bench and metal information board at Garforth Allotments and Main Street. | £548.03 |
| Bramley and Stanningley | 18/06137 | Ross Studios, Rodley Lane | Play area improvements at Rodley Park. | £10,254.84 |
| Kirkstall | 11/03274 | 2 Bridge Road, Kirkstall | Knee rail fencing at Kirkstall Abbey. | £35,592 |
| Headingley and Hyde Park | 13/00868 | Victoria Road, Headingley | Greenspace Enhancements - additional spend at Royal Park. | £60,878.15 |
| Headingley and Hyde Park | 15/04327 | Woodhouse Street, Woodhouse | Greenspace Enhancements - additional spend at Royal Park. | £14,070.24 |
| Headingley and Hyde Park | 15/00565 | Cockroft House, Cardigan Road | Greenspace Enhancements - additional spend at Royal Park. | £5,696.58 |
| Headingley and Hyde Park | 18/02754/FU | 38 North Grange Road Headingley | Greenspace Enhancements - additional spend at Royal Park. | £13,334.16 |
| Headingley and Hyde Park | 18/05854 | One Stop, 187 Woodhouse Street | Greenspace Enhancements - additional spend at Royal Park. | £1,020.87 |
| Little London and Woodhouse | 18/01805/FU | Leeds College of Building, The Millwright Building | Play Area Refurbishment - additional spend at Oatland Drive. | £1,300 |
| Morley North | 13/00625 | Land off Daisy Hill Close, Morley | Fencing - HAP Scheme at Kingsway. | £260.21 |
| Kippax and Methley | 20/05669/RM | Land off Church Lane Micklefield | Unadopted footpath / cycleway link at Churchfield Terrace. | £5,332 |
| Kippax and Methley | 20/05669/RM | Land off Church Lane Micklefield | Improvements to Micklefield Footpath No.3. | £43,700 |
| Hunslet and Riverside | 12/01191 | Car Park 'D' Site Portland Crescent and Cookridge Street | Landscaping Contributions - travel scheme CRSTS Leeds City Links. | £12,397.38 |
| Hunslet and Riverside | 09/03230 | St Peters Church and House, Chantrell House, Leeds Parish Church | Landscaping Contributions - travel scheme CRSTS Leeds City Links. | £2,500 |
| Pudsey | 17/08294 | Land Off Tyersal Close | Play Area Improvements at Tyersal Park. | £3,560 |
| Otley and Yeadon | 09/00349 | Prince Henry's School Annexe, Newall Carr Road | Investment in play areas in Otley and Yeadon. | £39,304.05 |
| Otley and Yeadon | 13/03022 | Former Wharfedale Hospital, Newall Carr Road | Investment in play areas in Otley and Yeadon. | £62,695.95 |
| Moortown | 19/05419 | Land Off Queenshill Avenue And Queenshill View | Play area improvements at Stretton Avenue Meanwood. | £16,258.56 |
| Little London and Woodhouse | 18/05316 | 19 Springfield Mount, Woodhouse | Tree planting at Woodhouse Moor. | £3,500 |
| Little London and Woodhouse | 20/04263/FU | Leeds Arts University, Blenheim Walk, Woodhouse | Tree planting at Woodhouse Moor. | £11,494.22 |
| Little London and Woodhouse | 18/04278 | 6 Bingley Street, Woodhouse | Tree planting at Woodhouse Moor. | £9,180 |
| Little London and Woodhouse | 18/05307 | 23-27 Hyde Terrace, Wodhouse | Tree planting at Woodhouse Moor. | £3,012 |
| Little London and Woodhouse | 20/02958 | Caroline House, Diamond House, Sheepscar Stree South | Environmental project at Lovell Park. | £116,562.55 |
| Gipton and Harehills | 07/01012 | Site 4 Thorn Walk, Site 5 Oak Tree Drive/Amberton Road | Play area improvements at Gipton Square Recreation Ground. | £5,619 |
| Gipton and Harehills | 07/01012 | Site 4 Thorn Walk, Site 5 Oak Tree Drive/Amberton Road | Play area improvements at Gipton Square Recreation Ground. | £3,923.28 |
| Beeston and Holbeck | 19/03367 | Land Off Moorhouse Avenue And Old Lane. Beeston | Surfacing signs fitness project Cross Flatts Park. | £35,804 |
| Ardsley and Robin Hood | 12/02974 | Land to rear of 7 Waterwood Close, Tingley | Work on improving Lofthouse recreation ground. | £14,486.89 |
| Crossgates and Whinmoor | 08/00298 | Optare, Manston Lane, Cross Gates | Improvements to Farndale Play area. | £30,575.71 |
| Little London and Woodhouse | 20/02958 | Caroline House, Diamond House, Sheepscar Street South | Access Improvements at Park Square. | £114,000 |
| Little London and Woodhouse | 20/02958 | Caroline House, Diamond House, Sheepscar Street South | Green space improvement project in City Centre. | £32,000 |
| Total | £1,193,483.80 |